HOME > DETAIL
Sintering waste heat power generation unit contracted by ASSB Operation Business Department of Wuhan City Environment Protection Engineering (M) Sdn. Bhd. successfully commissioned
Time:17 September 2019 Author:系统管理员 Source:

The 1x15MW sintering waste heat power generation unit of Alliance Steel (M) Sdn. Bhd. was connected to the power grid successfully on September 9, 2019. ASSB Operation Business Department of Wuhan City Environment Protection Engineering (M) Sdn. Bhd. is responsible for the operation of the power generation unit, which is last one of the five power generation units with total installed capacity of 209MW.

Copyrights© 2017 WISDRI Engineering & Research Incorporation Limited. All rights reserved.
Add: No.33, Daxueyuan Rd., Donghu High-tech Development Zone, Wuhan, Hubei Province, P. R. China.

Zip: 430223 Tel: 0086 27 81996178 Fax: 0086-81996666-04088 Email: 04088@wisdri.com