HOME > DETAIL
Secondary Slag Treatment Line of Dexin Indonesia 2*120t Converter Steelmaking Project Was Put into Operation
Time:25 May 2021 Author:海外营销部 Source: View:

As the first slag treatment line ever undertaken by WISDRI, the captioned production line went into operation on April 26th.

The line is designed with a capacity of 420,000 t/a slag. After 2 times of crushing, 3 times of magnetic separation and 4 times of screening, both magnetic and non-magnetic materials become higher value-added products. Served to reduce the slag storage, this line also turns waste into treasure by recovering the valuable resources.

The secondary slag treatment line promises to benefit Dexin Indonesia substantially by lowering steelmaking costs and boosting green economy. Going forward, driven by the ambition of expanding the global presence, WISDRI will renew its strong commitment to providing caring and professional service for the Owner. (WISDRI ISERI)

Copyrights© 2017 WISDRI Engineering & Research Incorporation Limited. All rights reserved.
Add: No.33, Daxueyuan Rd., Donghu High-tech Development Zone, Wuhan, Hubei Province, P. R. China.

Zip: 430223 Tel: 0086 27 81996178 Fax: 0086-81996666-04088 Email: 04088@wisdri.com